Four 4 types of river vessels were involved in the transportation, and the entire route took 41 days.
One of the main features of the project was the timing of navigation in
different basins. For example, when navigation in the Gulf of OBb is just
opening, there are 2−3 weeks left before the Tura navigation closes, and this is at aremains at good water level.
Our specialists promptly performed all loading and unloading
operations at transit points, which allowed us to deliver the cargo to
the planned destination on time.
The final stage was carried out by professionals from UTair-Helicopter Services JSC. It was very spectacular and covered by local journalists.